OnLevel 6020 Base Fix Channel Anodised Length - 2.5m
OnLevel 6020 Base Fix Channel Anodised Length - 2.5m
Fixing holes are Ø14mm at 100mm cemtres to suit Ø10mm bolts.
Handy Installation Tips
- Place the glass carrier holders into the aluminium channel
- Carefully drop the glass into the channel
- Dropt the glass wedge opposite the glass carrier but don't force it down. If you force it down, you will prevent the glass carrier from moving and being able to set the glass alignment because the glass will already appear "locked"
- The glass should be 2-3mm forward facing you from the panel you are aligning against
- Finally, push the glass wedge down with the combi tool, this will push the glass back those 2-3mm for a perfect alighment
The temptation is to force down the glass wedge before aligning the glass with the glass carrier and the flex-fit tool. It is the most common error made by an installer new to OnLevel systems.
14.9 dia x110mm Hex Flange Head Concrete R-LX-ZF (Zinc Flake) 12mm drill size
| CODE: | 5002HCS12100 |
|---|---|
| Sold As: | EACH |
R Stud M10 x 130mm with Hex Head Stainless Steel Grade 316 - Rawplug
| CODE: | 5006RS10130 |
|---|---|
| Sold As: | EACH |
1805490BA25
18 kg
£257.80EACH Ex VAT @ 20%
£309.36EACH Inc VAT @ 20%



